Maintenance Procedures & Recycling Timeline - EDT 6040 SEA

looooogogogogogogoog.png
title_main.png
The ELMO will be used in conjunction with the teachers’ existing laptops and projectors. The laptops and projectors already have predetermined maintenance procedures and replacement time-lines which will not be impacted by the addition of the ELMO unit. The only impact would be to the as-needed replacement of the projector bulbs because with the use of the ELMO, it is likely they will be worn out more frequently. In addition, the ELMO is maintenance free with the exception of the occasional need to replace the projector bulb. The need to do so will depend on how often the ELMO is used. Any other maintenance would be most likely as a result of wear and tear or breakage. These will be covered by the 3 year Warranty Replacement/Damage Protection Plan that will be purchased for each ELMO TT02 unit.


Daily
§ Teachers monitoring usage of ELMO unit and making sure it is stored in a safe area where it will not be likely to be knocked over.
§ ELMO stored securely on flat surface.
Monthly
§ Dusting
As needed
§ Replacement of projector bulb
§ Possible replacement of broken parts or need to send for repair using Warranty Replacement/Damage Protection Plan


Click here to continue to Evaluation & Modification Strategies


linksssss.png
  1. Vision and Personal Philosophy of Education
  2. Needs Assessment & Identification of Focus Area

  3. Initiatives to Address Needs

  4. Addressing Standards

  5. Hardware & Software Components and Licensure

  6. Funding

  7. Professional Development & Support

  8. Maintenance Procedures & Recycling Timeline

  9. Evaluation & Modification Strategies

  10. Bibliography

  11. Reflection